PCA 115kV Transmission Line

PCA 115kV Transmission Line

Location
Carlsbad, New Mexico
Client
Central Valley Electric Coop
Designer
SGS Engineering
Contract Value
$2,300,000
Completion Date
2013
Market Sector
Power
Capabilities
Self Performance
Atkinson Power constructed 20 miles of new 115kV transmission line through the desert to feed a new substation and support the continued electrical need for the ongoing energy boom in the area. Atkinson installed concrete anchor bolt foundations, direct embed steel monopoles, and steel H-structures with 795 ACSR conductor and an Optical Ground Wire.